Statutory rules governing liquidator disclaimers of off-grid industrial gas turbine power purchase agreements under the Companies and Allied Matters Act 2020 allow court-appointed or creditors liquidators to disclaim unprofitable contracts and onerous property pursuant to Section 663 of CAMA 2020. However, in the Nigerian energy sector, this insolvency power is subject to strict statutory notice requirements, leave of the Federal High Court, and regulatory coordination with the Nigerian Electricity Regulatory Commission under the Electricity Act 2023.
The Doctrine of Disclaimer Under Section 663 of CAMA 2020
Section 663 of CAMA 2020 establishes the statutory mechanism enabling a liquidator to divest an insolvent company of burdensome contractual commitments. Where an insolvent industrial manufacturing conglomerate is bound by an off-grid captive power purchase agreement (PPA) with an independent power producer requiring fixed monthly capacity charges, take-or-pay fuel obligations, or exorbitant gas indexing tariffs that drain estate assets, the liquidator may formally disclaim the contract in writing.
The disclaimer must be signed by the liquidator and executed within twelve months after the commencement of winding-up proceedings, or within such extended timeframe as the court permits. Once validly executed, the disclaimer terminates all contractual rights, interests, and ongoing liabilities of the insolvent company concerning the power purchase agreement. Crucially, Section 663(2) clarifies that the disclaimer does not affect the rights or liabilities of any other person, except so far as is indispensable for the purpose of releasing the company from ongoing liability.
Interplay with the Electricity Act 2023 and Regulatory Oversight
Insolvency practitioners in Nigeria cannot treat long-term industrial energy contracts as ordinary commercial debts without considering sectoral utility laws. Under the Electricity Act 2023, captive power generation plants and embedded distribution mini-grids operate under statutory permits and licenses issued by the Nigerian Electricity Regulatory Commission (NERC). Power purchase agreements frequently contain specialized interconnection commitments, dedicated gas pipeline supply allocations, and grid stability covenants.
Unilaterally disclaiming an industrial power purchase agreement can destabilize independent power generation facilities that secured international project financing based on long-term off-taker revenue guarantees. Consequently, Nigerian courts require liquidators to provide formal notice to NERC and engage in structured transitional negotiations before terminating grid-interconnected industrial power agreements. Ignoring regulatory requirements risks legal challenges that can stall the winding-up administration.
Rights of Independent Power Producers and Proof of Debt
Independent power producers and gas suppliers who suffer direct financial loss as a consequence of a power purchase agreement disclaimer are not left without statutory recourse. Under Section 663(7) of CAMA 2020, any person injured by the operation of a liquidator disclaimer is deemed to be an unsecured creditor of the company to the extent of the injury, and may prove the debt in the winding-up proceedings.
To substantiate a valid proof of debt, the power generation company must file an affidavit of proof of claim before the liquidator or the court. The damages claim encompasses the net present value of unpaid fixed capacity charges, unrecovered capital amortizations for dedicated gas turbines, and contractual termination penalties. Where disputes arise regarding the actuarial valuation of the unexpired PPA term, the Federal High Court adjudicates the assessment of damages upon originating summons.
Practice Considerations and Judicial Sanction at the Federal High Court
Where any interested party serves a formal notice requiring the liquidator to decide whether to disclaim the power purchase agreement, the liquidator must make an election within twenty-eight days. If the liquidator fails to disclaim within this statutory window, the company loses the right to disclaim and remains bound by the PPA covenants.
Prudent liquidators facing complex multi-party industrial energy agreements routinely apply to the Federal High Court for directions under Section 593 and Section 663 of CAMA 2020. The originating motion should be supported by an affidavit detailing the onerous nature of the energy tariffs, power plant maintenance obligations, and proposed transitional arrangements for site decommissioning. Judicial sanction insulates the liquidator from personal liability and ensures an orderly winding-up process consistent with Nigerian energy sector laws.